ArmInfo. "Lydian Armenia" CJSC was instructed not to carry out any activities to develop the Amulsar deposit before conducting a new examination and taking a decision on the basis of this examination. This was reported by the press service of the inspection body for the protection of nature and the bowels of the RA.
According to the source, the Ministry of Nature Protection of the Republic of Armenia proposed, on the basis of the new factors that appeared, to recognize as ineffective the expert decision approved by the Minister of Nature Protection on April 29, 2016. The head of the inspection body the Prosecutor General's Office in connection with the facts of extraction of Lydian Armenia CJSC mining mass without the right to subsoil use to identify the crime and in accordance with the established procedure to give a course to this case. With regard to the company "Yeghegnadzor water user", an administrative proceeding and determining the legality of supplying Lydian Armenia with water through the Kechut-Zaritap water pipeline were initiated. With regard to the enlarged community of the city of Jermuk, administrative proceedings were instituted for the use of the Gndevank's Seven Sources of Gidee water pipe in the Gnedevank community to supply water to Lydian Armenia, and to determine the eligibility for authorizing the installation of crushing stations during the construction process. The Prime Minister of Armenia presented a report on the conduct of inspections in contract organizations engaged in the construction of the Amulsar deposit.