Tuesday, November 5 2019 11:09
Alexandr Avanesov

Construction and installation work on the Vardenis-Jermuk gas  trunkline is nearing completion

Construction and installation work on the Vardenis-Jermuk gas  trunkline is nearing completion

ArmInfo. At the final stage, construction and installation works are underway for the  overhaul of the Vardenis-Jermuk gas trunkline, which Gazprom Armenia  CJSC is carrying out as part of the Overhaul Plan for 2019. This was  reported by the press service of the company.

According to the source, the gas pipeline with a diameter of 325 mm  and a length of 45.75 km was put into operation in 1977. In 2017, the  company's specialists conducted a comprehensive diagnostic  examination of the Vardenis-Jermuk gas pipeline, based on the results  of which comprehensive work is carried out. In particular, the gas  pipeline is undergoing major repairs with the pipe being replaced in  sections with a total length of 1.8 km, anti-corrosion insulation  coatings with a total length of 5.02 km are being restored with pipe  rejection if necessary, and crossings through roads in four sections  of the gas pipeline are being repaired.

In addition, in order to increase the reliability and uninterrupted  gas supply to consumers in Armenia, as well as in preparation for the  autumn-winter period, complex construction, installation and repair  work was carried out at the gas distribution system facilities.

Gazprom Armenia CJSC (a 100% subsidiary of Gazprom PJSC) supplies and  sells natural gas inland market of the Republic of Armenia. The  structure of the company includes 15 branches for gasification and  gas supply, organized on a territorial basis, a branch "Engineering  Center", 5 subsidiaries, as well as institutions "Hrazdan-5" and  <Training and Sports Complex>. CJSC Gazprom Armenia is one of the  largest employers in the republic. Gazprom Armenia CJSC sees its  mission in a reliable, efficient and uninterrupted supply of natural  gas to consumers in the republic, as well as in the long-term and  systematic development of the Company by further diversifying its  activities and those of the companies included in the structure of  the Company. The strategic goal of Gazprom Armenia CJSC is to create  a regional gas energy company that will actively participate in  energy projects both on the domestic and foreign markets.

POST A COMMENT
Input digits     


News
iDram
btn

Exchange rates
18.09.2020
RUB6.460.00
USD485.260.86
EUR574.983.39
GBP629.671.21
CAD368.541.65
JPY46.510.26
CNY71.790.21
CHF534.252.00



Search by date

Government Bonds

Issue volume

10 billion

Volume of T-bills for placement

200 million

Volume of submitted competitive applications

200 million

Volume of satisfied bids

200 million

Yield at cut-off price

 5.8314%

Maximum yield

 5.8314%

Мinimum yield

 5.8314%

Weighted average yield

 5.8314%

Number of participants

2

The maturity date of T-bills

03.02.2020

ArmEx

 

СПРОС (Покупка)

USD

Средневзв. Цена

482,00

ПРЕДЛОЖЕНИЕ (Продажа)

  USD

Средневзв. Цена

-

СДЕЛКИ

USD

Цена откр.

482,00

Цена закр.

482,00

Мин. Цена

482,00

Макс. Цена

482,00

Ср/взв. Цена

482,00

-0.16

Кол-во сделок

1

Объем (инвал.)

200 000

0бъем (драм)

96 400 000